Ir para o conteúdo
Home
Quem somos
Quem somos
Artigos IGLC
Portfólio
Serviços
In Company
Climb e Con.tech
Carreira
Home
Quem somos
Quem somos
Artigos IGLC
Portfólio
Serviços
In Company
Climb e Con.tech
Carreira
Fale conosco
Instagram
Linkedin
Spotify
Youtube
Artigos IGLC
Artigos IGLC
Artigos IGLC 2024
Bellaver, G. B., Etges, B. M. B. da S., Rego, L. H. A. & Staudt, L. 2024 - Takt and Pull Zones in the Construction of Logistics Warehouses.
Fireman, M. C.T., Bizarro, L.B., Antonini, B.G., Campos, G.S.D., Denardi Junior, C. & Etges, B.M.B.S. 2024 - Last Planner System in the owner’s perspective: case study in onshore wind energy projects.
Lima, C. M., Fireman, M. C. T., Nascimento, L. H., Etges, B. M. B. S., Antonini, B. G., Bluhm, B. B., Silva, D. P. & Rocha, F. C. O. 2024 - Agile ramp-up: a method to reduce premature construction start.
Moura, L.M., Antonini, B. G., Fireman, M.C.T., Etges, B.M.B.S., Campos, F.R. & Kronbauer, B.K. 2024 - Lean Construction implementation in the construction of an airport runway
Vieira, J. P. P., Etges, B. M. B. S., Vasconcelos, Fernando P. V., Bellaver, G. B. & Nogueira, H. R.. 2024 - Synergy Between LPS and Slack: A Case Study in Brazilian Horizontal Housing Developments.
Vieira, J.P.P., Pimentel, F.M., Etges, B.M.B.S., Silva, J.N.F., Bonkowsky, P.H., Bronholo, C., Fireman, M.C.T. & Bungardi, B. 2024 - Last Planner System: Pull Planning as a Documentation Management Tool in Photovoltaic Projects.
Artigos IGLC 2023
Reck, R. H. & Fireman, M. C. T. 2023 - A logistic framework to enable takt time planning
Etges, B. M. B. S., Ten Caten, C.S. 2023 - Lean supporting a framework for the construction innovation process.
Bizarro, Etges, B. ,Fireman M. 2023 - Analyzing the value adding activities in Brazilian Construction Companies.
Antonini, B.G., M., Fireman, Etges, B. 2023 - Logistics planning within the last planner system for highway construction projects.
Pereira, F., T., Fireman, M. & Etges, B. 2023 - Slack: what is lacking on supply chain resilience strategies?
Artigos IGLC 2022
Bellaver et al. 2022 - Implementing Lookahead Planning and Digital Tools to Enable Scalability and Set of Information in a Multi-Site Lean Implementation
Conte et al. 2022 - Exploring the Use of Digital Visual Management for Last Planner System Implementation
Pereira et al. 2022 - Collaborative Method for Training and Implementing the Line of Balance
Silva et al. 2022 - Using Pull Planning as a Method for the Certificate of Occupancy Process
Vieira et al. 2022 - Kaizen as an Improvement Method for Concrete Walls Construction in Social Housing Project
Artigos IGLC 2021
Trentin and Etges 2021 - Lean Construction and Organizational Knowledge Creation
Formoso et al. 2021 - Slack in Construction - Part 1_ Core Concepts
Saurin et al. 2021 - Slack in Construction - Part 2_ Practical Applications
Artigos IGLC 2020
Etges et al. 2020 - Using BIM With the Last Planner System to Improve Constraints Analysis
Fireman and Saurin 2020 - Chain of Wastes_ The Moderating Role of Making-Do
Serugga et al. 2020 - Front-End Design and Value Generation_ A Housing Project Analysis
Artigos IGLC 2018
Etges 2018 - Value-Adding Activities Level in Brazilian Infrastructure Construction Companies - 9 Cases Study
Etges et al. 2018 - A Lean Approach to Improve Productivity in a Coke Oven Refurbishment Project_ A Case Study
Fireman et al. 2018 - The Role of Slack in Standardized Work in Construction_ An Exploratory Study
Artigos IGLC 2012-2013
Fireman and Formoso 2013 - Integrating Production and Quality Control_ Monitoring Making-Do and Unfinished Work
Etges et al. 2013 - A Protocol for Assessing the Use of Lean Construction Practices
Etges et al. 2012 - Identifying Lean Construction Categories of Practices in the IGLC Proceedings